| Project Description: |
DISTRICT 5- VEGETATION REMOVAL AT VARIOUS LOCATIONS
The work consists of mechanically removing highway vegetation overgrowth on state highways in District 5 as directed by the Engineer. The work includes cutting grass and or weeds along under guardrail barriers and curbs. Work also includes the removal of small trees and brush from within the State Highway Limits by a vegetation removal crew and through use of an over the guardrail mower.
|
| Location: | |
| Construction Begins: | Winter 2021/2022 |
| Resident Engineer: | Joseph Goncalves![]() |
| Construction Bid Price: | $978,110.00 |
| District: | District 5 |
|