| Project Description: |
WAREHAM- IMPROVEMENTS ON ROUTE 6, BRIARWOOD DRIVE TO CROMESETT ROAD
The project consists of roadway reconstruction including a functional overlay and bicycle and pedestrian accommodations along this 0.9 mile section of Route 6.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Aidee Cira![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|