Project Description: |
BRIDGEWATER- METAL BUILDING RENOVATIONS AT 10 FRUIT STREET MAINTENANCE DEPOT
Work consists of the replacement of metal roof and siding of 6 bay garage
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2026 |
Project Manager: | Edmond Libsch |
Estimated Total Contract Cost: | $3,450,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | 25% Package Received (as of 03/27/2023 ) |
|
Bridges |
|
|
|