| Project Description: |
BRIDGEWATER- METAL BUILDING RENOVATIONS AT 10 FRUIT STREET MAINTENANCE DEPOT
Work consists of the replacement of metal roof and siding of 6 bay garage
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Edmond Libsch![]() |
| Estimated Total Contract Cost: | $3,450,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | 25% Package Received (as of 03/27/2023 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||||||||