Project Description: |
BURLINGTON- INSTALLATION OF MODULAR OFFICE AT MAINTENANCE DEPOT ON GRANT AVE
Work consists of replacing small old site trailer with double wide modular building
|
Location: |
|
Right of Way Responsibility: | Other |
Construction Begins: | Winter 2050/2051 |
Project Manager: | Edmond Libsch |
Estimated Total Contract Cost: | $900,000.35 |
Estimated Total Federal Participating Construction Cost: | N/A |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|