| Project Description: |
PLYMOUTH- INSTALLATION OF MODULAR OFFICE AT MAINTENANCE DEPOT ON OBERY AVE
Work consists of replacing small old site trailer with double wide modular building
|
| Location: |
|
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Edmond Libsch![]() |
| Estimated Total Contract Cost: | $500,000.45 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| Current Status: | This project is in the preliminary design phase. |
|