Project Description: |
MEDFORD- SOUTH MEDFORD CONNECTOR BIKE PATH
The project aims to provide a critical link in the regional transportation network that connects the two
existing Department of Conservation and Recreation DCR paths and support bicycle commuter access
throughout the region. The South Medford Connector Project has regional support for its importance as a regional bicycle commuter connection. The Massachusetts Department of Conservation and Recreation
DCR Metropolitan Area Planning Council MAPC and MRWA have studied the Lower Mystic River area
in detail resulting in recommendations to increase shared-use paths in the region. Through their Mystic Greenway Vision, the MRWA has been working to develop a continuous link of shared-use paths along the banks of the Mystic River and has identified the South Medford Connector as an important regional connection. The 2009 DCR Mystic River Master Plan also specifically highlights the South Medford Connector as an important connection between two other DCR shared-use paths in the Mystic River Reservation.
|
Location: |
|
Design Responsibility: | Consultant |
Construction Begins: | Summer 2027 |
Project Manager: | Linda Walsh |
Estimated Total Contract Cost: | $6,847,500.00 |
Estimated Total Federal Participating Construction Cost: | $7,056,912.50 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 4 |
Current Status: | The Notice to Proceed to begin work on the contract has been issued (as of 05/13/2022 ) |
|
Bridges |
|
|
|