Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
MEDFORD- SOUTH MEDFORD CONNECTOR BIKE PATH
The project aims to provide a critical link in the regional transportation network that connects the two existing Department of Conservation and Recreation DCR paths and support bicycle commuter access throughout the region. The South Medford Connector Project has regional support for its importance as a regional bicycle commuter connection. The Massachusetts Department of Conservation and Recreation DCR Metropolitan Area Planning Council MAPC and MRWA have studied the Lower Mystic River area in detail resulting in recommendations to increase shared-use paths in the region. Through their Mystic Greenway Vision, the MRWA has been working to develop a continuous link of shared-use paths along the banks of the Mystic River and has identified the South Medford Connector as an important regional connection. The 2009 DCR Mystic River Master Plan also specifically highlights the South Medford Connector as an important connection between two other DCR shared-use paths in the Mystic River Reservation.
Location:
  • City of Medford
  • Design Responsibility: Consultant
    Construction Begins: Summer 2027
    Project Manager: Linda Walsh
    Estimated Total Contract Cost: $6,847,500.00
    Estimated Total Federal Participating Construction Cost: $7,056,912.50
    Funding Provision: This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (1) Progress
    # 77868 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2027
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: MEDFORD
    Category: Advertised Projects Constr.
    Budget Section: 2C
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $7,903,743 (CMAQ)
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $6,322,994.40
    State Cost: $1,580,748.60
    Total Cost: $7,903,743.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/16/2021
    Project Need Form PNF Approved 09/08/2021
    Project Initiation Form PIF Entered 09/16/2021
    Project Initiation Form PIF Approved 09/16/2021
    Project Initiation Form PRC Submitted 09/16/2021
    Project Review Committee PRC Approved 10/21/2021
    Project Management