| Project Description: |
CHARLEMONT- BRIDGE REPLACEMENT, C-05-010, ROUTE 8A OVER DEERFIELD RIVER
The scope of work for this project consists of the full bridge replacement of the existing 4-span bridge structure with a wider cross section that can accommodate two (2) travel lanes, at least one (1) sidewalk and two (2) buffered bike lanes.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Autumn 2027 |
| Project Manager: | William F Brown![]() |
| Estimated Total Contract Cost: | $9,056,376.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | The Notice to Proceed to begin work on the contract has been issued (as of 01/19/2024 ) |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||||||||