Project Description:
REVERE- STATE ROAD BEACHMONT CONNECTOR
The project will reduce both northbound and southbound travel ways on State Road in Revere from two lanes to a single lane to provide separated bicycle facilities: a two-way separated bike lane along the west side of the southbound lanes and a one-way parking-protected bike lane along the east side of the northbound lanes. The proposed work will include improvements to bicycle and pedestrian facilities to promote safety and comfort for users by increasing operational space, horizontal and vertical roadway separation, and traffic calming roadway geometry. The proposed design will improve the sidewalk along both sides of State Road providing a direct, safe and accessible connection for pedestrians and cyclists to the Beachmont MBTA station, Revere Beach and businesses along Ocean Avenue. Crosswalks with accessible ramps are proposed across all side streets and signalized intersections to support pedestrian activity within the project area.
Location:
  • City of Revere
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Summer 2028
    Project Manager: Anni H Autio
    Estimated Total Contract Cost: $9,565,124.83
    Estimated Total Federal Participating Construction Cost: $10,104,467.67
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 4
    Current Status: 75% Package Received (as of 08/26/2026 )

    Contracts (1) Progress
    # 77868 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2028
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: REVERE
    Category: Advertised Projects Constr.
    Budget Section: 2C
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $7,114,664.80
    State Cost: $1,778,666.20
    Total Cost: $8,893,331.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/21/2021
    Project Need Form PNF Approved 08/26/2021
    Project Initiation Form PIF Entered 09/21/2021
    Project Initiation Form PIF Approved 09/21/2021
    Project Initiation Form PRC Submitted 10/18/2021
    Project Review Committee PRC Approved 10/21/2021
    Project Management
    25% Design 25% Package Received 09/12/2023
    25% Design Design Public Hearing 10/15/2024
    75% Design 75% Package Received 08/26/2026
    Consultant Contract Process NTP Issued 01/19/2022