| Project Description: |
BOSTON- TUNNEL PRESERVATION WITHIN MHS TUNNELS
This project will undertake various drainage improvements and preservation activities on tunnel infrastructure within the MHS Tunnels.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Autumn 2025 |
| Project Manager: | Hema P Bhatt![]() |
| Estimated Total Contract Cost: | $50,261,018.20 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project has been advertised for construction bids. (as of 06/07/2025 ) |
|
Bridges |
||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||