Project Description: |
BOSTON- TUNNEL PRESERVATION WITHIN CENTRAL ARTERY/TUNNEL SYSTEM
This project will undertake various drainage improvements and preservation activities on tunnel infrastructure within the Central Artery system.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Hema P Bhatt![]() |
Estimated Total Contract Cost: | $6,487,500.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|