| Project Description: |
NORTHBOROUGH- BELMONT STREET WATER LINE EXTENSION ON ROUTE 9
Work consists of installing water main extensions, hydrants, valves and decommissioning of existing private wells.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Anni H Autio![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||