Project Description: |
BOSTON- BRIDGE PRESERVATION, B-16-056, CAMBRIDGE STREET OVER I-90
Project will preserve the bridge deck on Cambridge Street over I-90 in order to extend its lifespan until a future bridge replacement is performed. The work will include deck patching, substructure patching, steel beam end repairs, and joint replacement.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | John Fallon |
Estimated Total Contract Cost: | $15,256,248.48 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | 25% Package Received - Resub 1 (as of 08/20/2024 ) |
|