Project Description: |
BOSTON- FLOOD PROTECTION OF CENTRAL ARTERY VENTILATION BUILDING #6 AT FID KENNEDY AVENUE (DESIGN ONLY)
This project will identify, design, and procure flood protections in various forms as needed at the following MassDOT facilities: 19 Fid Kennedy Avenue, 145 Havre Street, 50 Massport Haul Road, 370 D Street, and 250 Frontage Road.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Mark Carmichael |
Estimated Total Contract Cost: | $216,502.50 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|