Project Description: |
SOMERVILLE- BRIDGE REPLACEMENT, S-17-024, ROUTE 28/MCGRATH HWY OVER SOMERVILLE AVE EXT & MBTA
This project is to replace the Squire's Bridge carrying McGrath Hwy (Route 28) over Somerville Ave Extension & MBTA in Somerville, MA. The bridge will be replaced with a functional equivalent that also incorporates multi-modal accommodations. The project includes approach work along McGrath Hwy on either side of the bridge, including vaults, median barrier, curb, sidewalk, lighting, guardrail, curb ramps, stairways and/or pedestrian ramps, and other related work.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2029 |
Project Manager: | Christopher I Cameron |
Estimated Total Contract Cost: | $80,805,600.00 |
Estimated Total Federal Participating Construction Cost: | $83,798,400.00 |
Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 4 |
Current Status: | The Notice to Proceed to begin work on the contract has been issued (as of 07/19/2023 ) |
|
Bridges
|
|
|
|