| Project Description: |
BOSTON- UPS SYSTEM REPLACEMENTS IN CENTRAL ARTERY TUNNELS
This project would hire a design engineer to size and spec replacement UPS systems, including HVAC to protect the equipment, and procure and install the equipment.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Winter 2025/2026 |
| Project Manager: | Hema P Bhatt![]() |
| Estimated Total Contract Cost: | $30,470,441.27 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project has been advertised for construction bids. (as of 08/02/2025 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||