Project Description:
BOSTON- UPS SYSTEM REPLACEMENTS IN CENTRAL ARTERY TUNNELS
This project would hire a design engineer to size and spec replacement UPS systems, including HVAC to protect the equipment, and procure and install the equipment.
Location:
  • City of Boston
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Hema P Bhatt
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project