| Project Description: |
BOSTON- UPS SYSTEM REPLACEMENTS IN CENTRAL ARTERY TUNNELS
This project would hire a design engineer to size and spec replacement UPS systems, including HVAC to protect the equipment, and procure and install the equipment.
|
| Location: |
|
| Construction Begins: | Spring 2026 |
| Resident Engineer: | -- not assigned --![]() |
| Construction Bid Price: | $17,777,771.17 |
| District: | District 6 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||