Project Description: |
BOSTON- UPS SYSTEM REPLACEMENTS IN CENTRAL ARTERY TUNNELS
This project would hire a design engineer to size and spec replacement UPS systems, including HVAC to protect the equipment, and procure and install the equipment.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2025 |
Project Manager: | Hema P Bhatt |
Estimated Total Contract Cost: | $25,321,275.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | 25% Package Received (as of 10/30/2024 ) |
|
Bridges |
|
|
|