Project Description: |
WEBSTER- OXFORD- AUBURN- GUIDE AND TRAFFIC SIGN REPLACEMENT ON I-395
This project is for the replacement and upgrading of guide and traffic signs along Interstate 395 and intersecting secondary roadways between the Connecticut/Massachusetts state line in Webster and the US 20 interchange in Auburn, including applicable signing on intersecting secondary roadways
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Stephen Timmins |
Estimated Total Contract Cost: | $393,360.00 |
Estimated Total Federal Participating Construction Cost: | $447,000.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|