Project Description: |
NEW BEDFORD- CORRIDOR IMPROVEMENTS ON TARKILN HILL ROAD AND ASHLEY BOULEVARD
The proposed scope of work will address the intersection crash clusters with traffic signal reconstruction
at three intersections In addition area needs will be improved with an improved roadway resurface
address pedestrian accommodations through ADA compliant sidewalks crosswalks curb ramps and
address bicycle accommodation by providing bicycle lanes Traffic signals equipped with video detection
as well as GPS-enabled preemption and hardwire interconnect with Fire Station number 9 will facilitate
emergency vehicle operations. Along the corridor, there is the possibility that a sideline shared-use path
may facilitate bicycle accommodation more than buffered bicycle lanes, but this will need to be evaluated
further during the design phase.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Construction Begins: | Spring 2028 |
Project Manager: | Dongke Yu |
Estimated Total Contract Cost: | $11,789,500.00 |
Estimated Total Federal Participating Construction Cost: | $12,391,512.50 |
Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization. |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|