NEW BEDFORD- CORRIDOR IMPROVEMENTS ON TARKILN HILL ROAD AND ASHLEY BOULEVARD
The proposed scope of work will address the intersection crash clusters with traffic signal reconstruction at three intersections In addition area needs will be improved with an improved roadway resurface address pedestrian accommodations through ADA compliant sidewalks crosswalks curb ramps and address bicycle accommodation by providing bicycle lanes Traffic signals equipped with video detection as well as GPS-enabled preemption and hardwire interconnect with Fire Station number 9 will facilitate emergency vehicle operations. Along the corridor, there is the possibility that a sideline shared-use path may facilitate bicycle accommodation more than buffered bicycle lanes, but this will need to be evaluated further during the design phase.
Location:
  • City of New Bedford
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2028
    Project Manager: Dongke Yu
    Estimated Total Contract Cost: $11,789,500.00
    Estimated Total Federal Participating Construction Cost: $12,391,512.50
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization.
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2028
    Responsible MPO: Southeastern Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: NEW BEDFORD
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • a) Construction; b) Total Cost = $13,878,494 - STBG d) EC Score 57 of 100; h) Project Proponent - New Bedford; i) Status Pre 25%
  • Category FA - Surface Trans. Block Grant (STBG)
    Federal Cost: $11,102,796.00
    State Cost: $2,775,699.00
    Total Cost: $13,878,495.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/17/2022
    Project Need Form PNF Approved 01/11/2022
    Project Initiation Form PIF Entered 03/17/2022
    Project Initiation Form PIF Approved 03/17/2022
    Project Initiation Form PRC Submitted 04/29/2022
    Project Review Committee PRC Approved 05/12/2022