Project Description:
WILLIAMSTOWN- ROUTE 7 ACCESS IMPROVEMENTS AT MOUNT GREYLOCK REGIONAL SCHOOL
To address access and egress concerns at this location, the District is proposing minor geometric improvements consisting of traffic island modification, changes to auxiliary turn lanes, highway resurfacing, and revised pavement markings to re-assign motor vehicle lanes and bicycle accommodation. An Intersection Collision Warning System (ICWS) will also be installed on Route 7 in advance of the school entrance. These changes are being proposed in response to operational and safety concerns by parents and school officials regarding traffic conditions at the school entrance during arrival and dismissal times.
Location:
  • Town of Williamstown
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Koby J Lemrise
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project