Project Description: |
BARNSTABLE- INTERSECTION IMPROVEMENTS AT ROUTE 28 (FALMOUTH ROAD) AND SANTUIT/NEWTOWN ROAD
Work on this project consists of upgrades to the intersection. Installation of a traffic signal will be evaluated as part of the design. Multi-modal upgrades are also proposed.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Thomas H Currier |
Estimated Total Contract Cost: | $4,161,000.00 |
Estimated Total Federal Participating Construction Cost: | $4,617,450.00 |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|