Project Description: |
SOUTHAMPTON- REHABILITATION/RECONSTRUCTION & RELATED WORK ON EAST STREET, FROM COLLEGE HIGHWAY (ROUTE 10) TO WHISPERING MEADOW LANE
The project proposes to construct two 11 foot wide travel lanes with 2 foot wide shoulders. A 10 foot wide shared use path and wetlands buffer is proposed for the entire South East Street along with a 5 foot wide sidewalk. A variable buffer is also proposed on the north side to 570 feet east of Clark Street to preserved trees.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Construction Begins: | Summer 2028 |
Project Manager: | Filbert Yee |
Estimated Total Contract Cost: | $8,877,525.50 |
Estimated Total Federal Participating Construction Cost: | $9,352,769.38 |
Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization. |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|