Project Description: |
TOWNSEND- BRIDGE PRESERVATION, T-07-003, STATE 13 (FITCHBURG ROAD) OVER THE SQUANNACOOK RIVER
The scope of this project will consist of the reconstruction of the bridge joints, repairing the beam ends, patching the deck and substructure and addressing safety related issues on the bridge and approaches.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2024 |
Project Manager: | Genesis Poz Diaz |
Estimated Total Contract Cost: | $1,631,447.30 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | PS&E Received - Resub 1 (as of 03/19/2024 ) |
|
Bridges
|
|
|
|