Project Description:
HARVARD- LANCASTER- BRIDGE REPLACEMENT, H-09-019=L-02-020, JACKSON ROAD OVER NASHUA RIVER
The proposed project consists of the full replacement of the bridge which carries Jackson Road over the Nashua River in the Towns of Harvard and Lancaster, MA. The existing bridge structure will be replaced with a 145’-0” single-span, metalized steel plate girder bridge supported on steel piles. The bridge will be widened to accommodate an additional shoulder width and a new southbound traffic lane. The new structure will carry three (3) 12’-0” lanes of traffic and provide two (2) 4’-0” shoulders. The bridge will also have two (2) safety curbs. Jackson Road is an Urban Local Road and currently does not have any sidewalks. The proposed work includes approach roadway work that will extend approximately 200 feet to the west and 800 feet east from each end of the bridge and will involve a full-depth reconstruction of Jackson Road. The proposed bridge will be constructed in two stages. During construction, a minimum of one travel lane will be maintained via alternating traffic with temporary signals.
Location:
  • Town of Harvard
  • Town of Lancaster
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Autumn 2026
    Project Manager: William F Brown
    Estimated Total Contract Cost: $18,432,249.30
    Estimated Total Federal Participating Construction Cost: $10,421,491.20
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Montachusett Metropolitan Planning Organization.
    District: District 3
    Current Status: Design Public Hearing (as of 05/08/2025 )

    Contracts (1) Progress
    # 115750 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final

    Bridges

    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Montachusett Metropolitan Planning Organization
    Location: Municipality
    Cities: HARVARD
    LANCASTER
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Surface Trans. Block Grant (STBG) - Off System Bridge
    Federal Cost: $8,670,680.80
    State Cost: $2,167,670.20
    Total Cost: $10,838,351.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 06/17/2022
    Project Initiation Form PIF Entered 06/17/2022
    Project Initiation Form PRC Submitted 09/29/2022
    Project Review Committee PRC Approved 12/20/2022
    Project Management
    25% Design 25% Package Received 09/27/2024
    25% Design 25% Package Comments to DE 11/01/2024
    25% Design 25% Package Approved 02/28/2025
    25% Design Design Public Hearing 05/08/2025
    Consultant Contract Process Scope to DE 09/21/2022
    Consultant Contract Process NTP Issued 02/15/2023