Project Description: |
DUDLEY- BRIDGE REPLACEMENT, D-12-004, BRANDON ROAD OVER THE FRENCH RIVER AND D-12-027, BRANDON ROAD OVER MILL RACE CANAL
The scope of work shall consist of replacing the deficient bridge that carries Brandon Road over the French river and replace/rehabilitation the bridge that carries the roadway over the Mill Race Canal.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Project Manager: | Thomas H Currier |
Estimated Total Contract Cost: | $5,805,000.00 |
Estimated Total Federal Participating Construction Cost: | $6,235,000.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|