| Project Description: |
DUDLEY- BRIDGE REPLACEMENT, D-12-004, BRANDON ROAD OVER THE FRENCH RIVER AND D-12-027, BRANDON ROAD OVER MILL RACE CANAL
The scope of work shall consist of replacing the deficient bridge that carries Brandon Road over the French river and replace/rehabilitation the bridge that carries the roadway over the Mill Race Canal.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Thomas H Currier![]() |
| Estimated Total Contract Cost: | $5,805,000.00 |
| Estimated Total Federal Participating Construction Cost: | $6,235,000.00 |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|