Project Description: |
FRAMINGHAM- BRIDGE PRESERVATION, F-07-051, I-90 EXIT 111 (RAMP) OVER ROUTE 9
The scope of work will consist of substructure and structural repair, joint reconstruction, clean and paint the structural steel and replacing the wearing surface.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2023 |
Project Manager: | Alyson Bedard![]() |
Estimated Total Contract Cost: | $3,593,833.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 07/29/2023 ) |
|