OAK BLUFFS- CULVERT REPLACEMENT ON BEACH ROAD AT FARM POND
The purpose and need of this project is multi-fold. The intent is address lack of adequate tidal flushing of Farm Pond due to the culvert size constraint; improve resiliency for state highway, which currently overtops in significant storm events; and improve the crossing for non-motorized traffic at the existing crosswalk; review the gap between the end of sidewalk and the beginning of the shared use path.
Location:
  • Town of Oak Bluffs
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Summer 2028
    Project Manager: Thomas H Currier
    Estimated Total Contract Cost: $4,980,375.00
    Estimated Total Federal Participating Construction Cost: $5,367,688.75
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Martha's Vineyard Commission.
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2028
    Responsible MPO: Martha's Vineyard Commission
    Location: Municipality
    Cities: OAK BLUFFS
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT)
    Federal Cost: $4,809,449.60
    State Cost: $1,202,362.40
    Total Cost: $6,011,812.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/18/2022
    Project Need Form PNF Approved 08/18/2022
    Project Initiation Form PIF Entered 08/18/2022
    Project Initiation Form PIF Approved 08/18/2022
    Project Initiation Form PRC Submitted 08/23/2022
    Project Review Committee PRC Approved 09/15/2022
    Project Management