| Project Description: |
OAK BLUFFS- CULVERT REPLACEMENT ON BEACH ROAD AT FARM POND
The purpose and need of this project is multi-fold. The intent is address lack of adequate tidal flushing of
Farm Pond due to the culvert size constraint; improve resiliency for state highway, which currently
overtops in significant storm events; and improve the crossing for non-motorized traffic at the existing
crosswalk; review the gap between the end of sidewalk and the beginning of the shared use path.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2029 |
| Project Manager: | Thomas H Currier![]() |
| Estimated Total Contract Cost: | $4,980,375.00 |
| Estimated Total Federal Participating Construction Cost: | $5,367,688.75 |
| Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Martha's Vineyard Commission. |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||