Project Description:
OAK BLUFFS- CULVERT REPLACEMENT ON BEACH ROAD AT FARM POND
The purpose and need of this project is multi-fold. The intent is address lack of adequate tidal flushing of Farm Pond due to the culvert size constraint; improve resiliency for state highway, which currently overtops in significant storm events; and improve the crossing for non-motorized traffic at the existing crosswalk; review the gap between the end of sidewalk and the beginning of the shared use path.
Location:
  • Town of Oak Bluffs
  • Project Manager: Thomas H Currier
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project