Project Description: |
SWANSEA- CORRIDOR IMPROVEMENTS ON ROUTE 118, FROM MILFORD ROAD TO WOOD STREET
The proposed reconstruction of Swansea Mall Drive will reallocate lane width to carry one lane of travel in each direction. A shared use path will also be continued along the east side of the roadway and sidewalks will be evaluated on both sides of the roadway. Traffic controls will be evaluated at Wood
Street and Sea Swan Avenue as part of this project.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Lawrence Cash |
Estimated Total Contract Cost: | $8,922,348.00 |
Estimated Total Federal Participating Construction Cost: | $9,245,860.95 |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|