| Project Description: |
BARNSTABLE- PEDESTRIAN IMPROVEMENTS ON ROUTE 6A, FROM ROUTE 132 TO OLD JAIL LANE
There is a lack of connectivity for compliant sidewalks along the Route 6A corridor. This is a route to
Barnstable Village, a school exists on this corridor and it is a residential neighborhood. Approval of this project is intended for preliminary design. Survey and preliminary design will establish the feasibility and priorities of reconstruction/installation of sidewalk along this section of Route 6A.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Thomas H Currier![]() |
| Estimated Total Contract Cost: | $4,158,000.00 |
| Estimated Total Federal Participating Construction Cost: | $4,584,650.00 |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|