| Project Description: |
BOSTON- BRIDGE REHABILITATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA
This bridge rehabilitation project involves deck repair or replacement and related work, including any required superstructure repairs, guardrail and barrier, curb and sidewalk, drainage, signage and pavement markings, minor safety improvements, and utility relocations as required. The project also includes superstructure painting and minor substructure repairs. Sidewalk reconstruction is also included to provide vertically-separated shared-use paths.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Spring 2028 |
| Project Manager: | Christopher I Cameron![]() |
| Estimated Total Contract Cost: | $19,978,122.75 |
| Estimated Total Federal Participating Construction Cost: | $20,741,786.00 |
| Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 6 |
| Current Status: | 25% Package Comments to DE (as of 11/12/2025 ) |
|
Bridges
|
||||||
|
|
||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||