Project Description: |
BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA
This bridge preservation project involves deck repair or replacement and related work, including any required superstructure repairs, guardrail and barrier, curb and sidewalk, drainage, signage and pavement markings, and minor safety improvements as required.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Construction Begins: | Summer 2027 |
Project Manager: | Christopher I Cameron |
Estimated Total Contract Cost: | $15,074,000.00 |
Estimated Total Federal Participating Construction Cost: | $15,895,900.00 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 6 |
Current Status: | The Contract Scope of Work has been sent to the Design Engineer for consideration (as of 04/05/2023 ) |
|
Bridges
|
|
|
|