| Project Description: |
STURBRIDGE- DRAINAGE IMPROVEMENTS AT ROUTE 20 (MAIN STREET) AND CHURCH STREET
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | James Robida![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | 25% Package Received (as of 03/14/2023 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||||||||||||||