Project Description:
OTIS- RECONSTRUCTION OF ROUTE 23, INCLUDING CULVERT REPLACEMENT, O-05-004, ROUTE 23 OVER BENTON BROOK
The existing culvert at this location (approx. MM 22.1) consists of two 4-ft diameter corrugated steel pipes which are severely deteriorated. These pipes will be removed and replaced with a new structure that meets stream crossing standards and MassDOT Complete Streets, to the maximum extent feasible. Substantial retaining walls may need to be constructed on the highway approaches to accommodate widening.
Location:
  • Town of Otis
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Summer 2027
    Project Manager: Gautam Sen
    Estimated Total Contract Cost: $5,460,000.00
    Estimated Total Federal Participating Construction Cost: $6,026,200.00
    Funding Provision: This project is planned to be funded through the 2027 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization.
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2027
    Responsible MPO: Berkshire Metropolitan Planning Organization
    Location: Municipality
    Cities: OTIS
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT)
    Federal Cost: $5,206,636.80
    State Cost: $1,301,659.20
    Total Cost: $6,508,296.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/21/2022
    Project Need Form PNF Approved 09/20/2022
    Project Initiation Form PIF Entered 09/21/2022
    Project Initiation Form PIF Approved 09/21/2022
    Project Initiation Form PRC Submitted 11/23/2022
    Project Review Committee PRC Approved 12/20/2022