| Project Description: |
BOSTON- BRIDGE REPLACEMENT, BRIDGE B-16-409 US 1 (SB) OVER US 1 (NB), SOUTH APPROACH TO TOBIN BRIDGE
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | John Fallon![]() |
| Estimated Total Contract Cost: | $55,782,015.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||