Project Description:
BOSTON- BRIDGE REPLACEMENT, BRIDGE B-16-409 US 1 (SB) OVER US 1 (NB), SOUTH APPROACH TO TOBIN BRIDGE
Location:
  • City of Boston
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: John Fallon
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • B16409 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project