Project Description: |
BOSTON- BRIDGE REPLACEMENT, BRIDGE B-16-409 US 1 (SB) OVER US 1 (NB), SOUTH APPROACH TO TOBIN BRIDGE
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | John Fallon |
Estimated Total Contract Cost: | $55,782,015.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|