| Project Description: |
WILLIAMSTOWN- RESURFACING AND RELATED WORK ON ROUTE 7
Project includes resurfacing & related work on a 2.2-mi rural section of Route 7. Proposed work will likely include pavement milling/overlay, adjustment of drainage structures (if any), signs, pavement markings, rumble strips, guardrail upgrades (at bridge approaches), and driveway/side-street aprons within highway layout.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Winter 2025/2026 |
| Project Manager: | Koby J Lemrise![]() |
| Estimated Total Contract Cost: | $2,975,355.75 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project has been advertised for construction bids. (as of 11/08/2025 ) |
|