| Project Description: |
STOW- SHARED USE PATH CONSTRUCTION ON TRACK ROAD ALONG ASSABET RIVER RAIL TRAIL
The proposed project consists of construction of a shared use path along a section of the Assabet River Rail Trail (ARRT). The proposed cross-section will provide a safe path of travel for pedestrians and bicycles, while maintaining a path of travel for vehicles accessing the Crow Island Airpark. Completion of this section will close a gap in the existing rail trail system.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Adam W Kiel![]() |
| Estimated Total Contract Cost: | $6,701,970.85 |
| Estimated Total Federal Participating Construction Cost: | $7,387,507.95 |
| District: | District 3 |
| Current Status: | 25% Package Received (as of 01/08/2026 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||||||||||||||