Project Description: |
CHELMSFORD- LOWELL- DECK REPLACEMENT, C-08-030 (2JG) AND L-15-065 (2H2, 2H3), LOWELL CONNECTOR (NB/SB) AND LOWELL CONNECTOR B-11 OVER I-495
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Lawrence Cash |
Estimated Total Contract Cost: | $11,218,230.00 |
Estimated Total Federal Participating Construction Cost: | $11,633,720.00 |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|