| Project Description: |
EVERETT- TARGETED MULTI-MODAL AND SAFETY IMPROVEMENTS ON ROUTE 16 (DESIGN ONLY)
The project team is proposing a two-phase approach for implementing infrastructure improvements along the project corridor. The first phase would include the implementation of short-term and mid-term safety enhancements recommended as part of the Road Safety Audit (RSA) that was conducted for the project corridor in August 2021, including reducing the roadway cross section from six lanes (three lanes in each direction) to four lanes (two lanes in each direction) to reduce vehicle conflict points and to provide safe facilities for pedestrians and cyclists along the corridor. These improvements would be implemented as a short-term targeted safety project using signs, pavement markings, minor traffic signal improvements, and limited ADA upgrades to assess operational and safety effects prior to a full corridor reconstruction project
|
| Location: |
|
| Design Responsibility: | Consultant |
| Construction Begins: | Autumn 2027 |
| Project Manager: | Jacob Tanoglu![]() |
| Estimated Total Contract Cost: | $9,842,250.00 |
| Estimated Total Federal Participating Construction Cost: | $10,134,320.00 |
| Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|