| Project Description: |
SAVOY- BRIDGE REPLACEMENT, S-06-011, BLACK BROOK RD OVER BLACK BROOK
This project will consist of the full replacement of the existing bridge. No sidewalk or pedestrian improvements are anticipated. A full bridge closure with a detour will be favorable during construction, even with the long detour that would be required.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | William F Brown![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization. |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
||||||||||||||||||||||||||||||||||||||||
|
||