Project Description: |
BERNARDSTON- LEDGE REMOVAL FOR HIGHWAY SAFETY AT VARIOUS LOCATION
The scope of work is to assess the location where rockslide may become a hazard. The assessment will be performed using geotechnical studies to identify the best method to safely remove the ledges.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2026/2027 |
Project Manager: | Stephanie Upson |
Estimated Total Contract Cost: | $2,107,500.00 |
Estimated Total Federal Participating Construction Cost: | $1,791,975.00 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Franklin Regional Council of Governments. |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|