| Project Description: |
LEXINGTON- DECK REPLACEMENT, L-10-019 (2DW, 2DX), STATE ROUTE 2/CONCORD TURNPIKE OVER PLEASANT STREET
This project will be a deck replacement of the bridge carrying route 2 and any additional repairs needed to the superstructure or substructure in the Town of Lexington.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Winter 2027/2028 |
| Project Manager: | Genesis Poz Diaz![]() |
| Estimated Total Contract Cost: | $12,420,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|