| Project Description: |
NEWTON- BRIDGE PRESERVATION OF N-12-048 & N-12-049, STATE ROUTE 9/BOYLSTON STREET OVER QUINOBEQUIN ROAD AND CHESTNUT STREET
This project will restore the masonry and upgrade the traffic safety system on two bridges carrying Route 9 overt Quinobequin Road and Chestnut Street in the City of Boston and Town of Newton.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alina Daragan![]() |
| Estimated Total Contract Cost: | $6,580,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
|||||||||||||||||||||||||||||