| Project Description: |
WORCESTER- BRIDGE PRESERVATION, W-44-100 (1KH), W-44-101 (1TG) AND W-44-138 (1TQ), I-190 & I-290 INTERCHANGE
Bridge preservation consisting of latex modified concrete overlay and retrofit of the existing bridge railing for the I-290 ramps near Millbrook Street and Burncoat Street in the city of Worcester.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2027 |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Contract Cost: | $10,379,200.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|