Project Description:
|
HUNTINGTON- BRIDGE PRESERVATION, H-27-006 (0DH), STATE ROUTE 112/EAST MAIN STREET OVER CSXT AND WESTFIELD RIVER
The work to be done under this contract consists of furnishing all the necessary labor, materials and
equipment required for the preservation of Bridge No. H-27-006 (0DH), which carries Massachusetts
State Route 112 (East Main Street) over the Westfield River and as shown on the plans. Included as part of the work is the replacement of the existing concrete deck (except at span 2), concrete sidewalks, and railing in spans 1 and 3 through 7; repair and strengthening of steel beams in
approach spans and stringers, floorbeams, hangers, gusset plate and arch rib in span 6; installation of
new CM-MTL3 barriers; refurbishment or replacement of existing ornamental rail; substructure
concrete repairs; pylon reconstruction; cleaning and re-painting of existing structural steel; installation
of new wheel guards; refurbishing existing pedestrian rail; replacing insulation on exposed water main
attached to the arch bridge (span 6); reconstruction of approach roadways; furnishing and installing
guardrail; furnishing and installing loam and seed; maintaining construction safety controls, and other
incidental items required to complete the work as shown on the drawings, as listed in the proposal, as
specified herein, and as directed by the Engineer.
|