Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
HUNTINGTON- BRIDGE PRESERVATION, H-27-006 (0DH), STATE ROUTE 112/EAST MAIN STREET OVER CSXT AND WESTFIELD RIVER
The work to be done under this contract consists of furnishing all the necessary labor, materials and equipment required for the preservation of Bridge No. H-27-006 (0DH), which carries Massachusetts State Route 112 (East Main Street) over the Westfield River and as shown on the plans. Included as part of the work is the replacement of the existing concrete deck (except at span 2), concrete sidewalks, and railing in spans 1 and 3 through 7; repair and strengthening of steel beams in approach spans and stringers, floorbeams, hangers, gusset plate and arch rib in span 6; installation of new CM-MTL3 barriers; refurbishment or replacement of existing ornamental rail; substructure concrete repairs; pylon reconstruction; cleaning and re-painting of existing structural steel; installation of new wheel guards; refurbishing existing pedestrian rail; replacing insulation on exposed water main attached to the arch bridge (span 6); reconstruction of approach roadways; furnishing and installing guardrail; furnishing and installing loam and seed; maintaining construction safety controls, and other incidental items required to complete the work as shown on the drawings, as listed in the proposal, as specified herein, and as directed by the Engineer.
Location:
  • Town of Huntington
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Construction Begins: Autumn 2025
    Project Manager: Stephen Soma
    Estimated Total Contract Cost: $25,584,000.00
    Estimated Total Federal Participating Construction Cost: $26,438,850.00
    Funding Provision: This project is planned to be funded through the 2025 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization.
    District: District 1
    Current Status: 75% Package Received (as of 01/22/2025 )

    Contracts (1) Progress
    # 115745 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final

    Bridges

    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2025
    Responsible MPO: Pioneer Valley Metropolitan Planning Organization
    Location: Municipality
    Cities: HUNTINGTON
    Category: Advertised Projects Constr.
    Budget Section: 1B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Hwy Infrast. Prgm (HIPBR) - Bridge
    Federal Cost: $9,614,000.00
    State Cost: $2,403,500.00
    Total Cost: $12,017,500.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 01/30/2023
    Project Need Form PNF Approved 01/26/2023
    Project Initiation Form PIF Entered 01/30/2023
    Project Initiation Form PIF Approved 01/30/2023
    Project Initiation Form PRC Submitted 04/21/2023
    Project Review Committee PRC Approved 08/11/2023
    Project Management
    25% Design 25% Package Received 08/12/2024
    75% Design 75% Package Received 01/22/2025
    Consultant Contract Process Scope to DE 11/07/2023
    Consultant Contract Process Scope to DE 12/08/2023