Project Description: |
HUNTINGTON- BRIDGE PRESERVATION, H-27-006 (0DH), STATE ROUTE 112/EAST MAIN STREET OVER CSXT AND WESTFIELD RIVER
This project consists of deck, superstructure, and substructure repairs in kind to restore bridges to state of good repair.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2025 |
Project Manager: | Stephen Soma |
Estimated Total Contract Cost: | $11,495,000.00 |
Estimated Total Federal Participating Construction Cost: | $12,017,500.00 |
District: | District 1 |
Current Status: | The Contract Scope of Work has been sent to the Design Engineer for consideration (as of 12/08/2023 ) |
|