Project Description: |
WEST SPRINGFIELD- DECK REPLACEMENT, W-21-037 (110 & 10Y), I-91 OVER I-90 AND W-21-036 (13L), BRUSH HILL OVER I-91
The bridge deck replacement project is proposed to extend the life of the structure as part of an overall
bridge preservation strategy. This is primarily a deck replacement project which aims to replace the reinforced concrete deck with a new reinforced concrete deck.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2027 |
Project Manager: | Lawrence Cash |
Estimated Total Contract Cost: | $11,726,000.00 |
Estimated Total Federal Participating Construction Cost: | $12,259,000.00 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization. |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|