Project Description: |
SANDWICH- BRIDGE PRESERVATION, S-04-007 (4BB) AND S-04-010 (4BC), QUAKER MEETING HOUSE ROAD OVER ROUTE 6/MID-CAPE HIGHWAY
Work consists of repairing or replacing the decks, substructures, and/or superstructures.
|
Location: |
|
Construction Begins: | Spring 2024 |
Resident Engineer: | Dylan Hipolito |
Construction Bid Price: | $1,994,273.75 |
District: | District 5 |
Current Status: | The contractor has installed shielding and brackets on the outside face of the Quaker Meeting House Rd bridge. They also removed the pink granite that was on top of the parapet. Demolition of the concrete parapet will begin in the upcoming weeks. Normal work hours are Monday through Friday, 7:00 AM to 5:00 PM. Expect periodic lane closures and restrictions. (as of 11/13/2024) |
|