| Project Description: |
BURLINGTON- LYNNFIELD- WAKEFIELD- WOBURN- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-95
Bridge preservation of 10 reinforced concrete frame bridges in Burlington, Lynnfield, Wakefield, and Woburn to include concrete patching and railing upgrades.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Spring 2026 |
| Project Manager: | Genesis Poz Diaz![]() |
| Estimated Total Contract Cost: | $13,620,279.58 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | PS&E Received - Resub 1 (as of 10/27/2025 ) |
|
Bridges
|
||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||