Project Description: |
BURLINGTON- LYNNFIELD- WAKEFIELD- WOBURN- BRIDGE PRESERVATION OF 10 BRIDGES CARRYING I-95
Bridge preservation of 10 reinforced concrete frame bridges in Burlington, Lynnfield, Wakefield, and Woburn to include concrete patching and railing upgrades.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2025/2026 |
Project Manager: | Genesis Poz Diaz |
Estimated Total Contract Cost: | $12,610,962.75 |
Estimated Total Federal Participating Construction Cost: | $12,948,242.88 |
District: | District 4 |
Current Status: | 75% Package Received - Resub 2 (as of 04/24/2024 ) |
|
Bridges
|
|
|
|