Project Description: |
SANDWICH- BRIDGE PRESERVATION, S-04-006 (470) AND S-04-009 (471), ROUTE 6 (MID-CAPE HIGHWAY EB/WB) OVER STATE ROUTE 130
Work consists of deck, superstructure, and substructure repair on the bridges carrying Route 6 over Route 130.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2028 |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $1,928,571.43 |
Estimated Total Federal Participating Construction Cost: | $2,071,428.57 |
Funding Provision: | This project is planned to be funded through the 2028 Transportation Improvement Program for the Cape Cod Metropolitan Planning Organization. |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|