Project Description: |
SANDWICH- BRIDGE PRESERVATION, S-04-008 (4BA) AND S-04-011 (4B9), CHASE ROAD OVER ROUTE 6 (MID-CAPE HIGHWAY)
Work consists of deck, superstructure, and substructure repair on the bridges carrying Chase Road over Route 6.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2026 |
Project Manager: | Albin Napit |
Estimated Total Contract Cost: | $1,504,286.10 |
Estimated Total Federal Participating Construction Cost: | $1,615,714.70 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Cape Cod Metropolitan Planning Organization. |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|