| Project Description: |
SANDWICH- BRIDGE PRESERVATION, S-04-008 (4BA) AND S-04-011 (4B9), CHASE ROAD OVER ROUTE 6 (MID-CAPE HIGHWAY)
Work consists of deck, superstructure, and substructure repair on the bridges carrying Chase Road over Route 6.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Albin Napit![]() |
| Estimated Total Contract Cost: | $1,560,000.40 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||