Project Description: |
BARNSTABLE- BRIDGE PRESERVATION, B-01-012 (4AP) AND B-01-014 (4AN), OAK STREET OVER ROUTE 6 (MID-CAPE HIGHWAY)
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2025 |
Project Manager: | Albin Napit |
Estimated Total Contract Cost: | $1,650,000.00 |
Estimated Total Federal Participating Construction Cost: | $1,800,000.00 |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|