CHARLEMONT- CHESHIRE- HUNTINGTON- BRIDGE PRESERVATION, C-05-024 (0KW), C-10-001 (0CU), C-10-010 (0CV), AND H-27-020 (0CN)
Work consists of deck, superstructure, and substructure repair on bridges carrying Rte 112 over the Westfield River, Rte 2 over the railroad west of Tower Road, and two bridges carrying Rte 116 over Dry Brook in the towns of Charlemont, Cheshire, and Huntington.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alina Daragan![]() |
| Estimated Total Contract Cost: | $6,334,840.00 |
| Estimated Total Federal Participating Construction Cost: | $6,775,850.00 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|