Project Description: |
CHARLEMONT- CHESHIRE- HUNTINGTON- BRIDGE PRESERVATION, C-05-024 (0KW), C-10-001 (0CU), C-10-010 (0CV), AND H-27-020 (0CN)
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $5,778,000.00 |
Estimated Total Federal Participating Construction Cost: | $6,206,000.00 |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|