Project Description: |
CHARLEMONT- NORTH ADAMS- SANDISFIELD- SHEFFIELD- BRIDGE PRESERVATION, C-05-011 (0JE), N-14-017 (0AJ), S-03-030 (0BV), AND S-10-034 (09Q)
Work consists of deck, superstructure, and substructure repair on bridges carrying Route 2 over Mill Brook in Charlemont, Route 2 over the Hoosic River in North Adams, Route 8 over Silvernail Brook in Sandisfield, and Route 7 over the Housatonic River in Sheffield.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2027 |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $4,981,500.00 |
Estimated Total Federal Participating Construction Cost: | $5,350,500.00 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the STATEWIDE. |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|