| Project Description: |
NORTH ADAMS- SANDISFIELD- SHEFFIELD- BRIDGE PRESERVATION, N-14-017 (0AJ), S-03-030 (0BV), AND S-10-034 (09Q)
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2027 |
| Project Manager: | Alina Daragan![]() |
| Estimated Total Contract Cost: | $5,866,400.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||