| Project Description: |
CHARLEMONT- NORTH ADAMS- SANDISFIELD- SHEFFIELD- BRIDGE PRESERVATION, C-05-011 (0JE), N-14-017 (0AJ), S-03-030 (0BV), AND S-10-034 (09Q)
Work consists of deck, superstructure, and substructure repair on bridges carrying Route 2 over Mill Brook in Charlemont, Route 2 over the Hoosic River in North Adams, Route 8 over Silvernail Brook in Sandisfield, and Route 7 over the Housatonic River in Sheffield.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2027 |
| Project Manager: | Alina Daragan![]() |
| Estimated Total Contract Cost: | $5,866,400.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||