| Project Description: |
WORCESTER- BRIDGE PRESERVATION OF 11 STRUCTURES ON I-190 AND RAMPS
Work consists of cleaning & painting of structural steel on bridges W-44-124 (1XF, 1XG), W-44-126 (1XJ, 1XK), W-44-127 (1XL), W-44-132 (1XN, 1XP), and W-44-133 (1XQ, 1XR) in the town of Worcester.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Genesis PozDiaz![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|