| Project Description: |
CHESTER- LANESBOROUGH- PITTSFIELD- RUSSELL- BRIDGE PRESERVATION OF C-11-027 (0DB), L-03-001 (0DJ), P-10-019 (0DQ) AND R-13-016 (0D6)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alina Daragan![]() |
| Estimated Total Contract Cost: | $3,375,000.00 |
| Estimated Total Federal Participating Construction Cost: | $3,625,000.00 |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||||||||